Case Study
Lightwands - Bullring Development, Birmingham, 2003
Gurit’s structural engineering and technical services teams worked closely with the builder, AMS Structures (based on the Isle of Wight), to define the construction method for the composite tubes. Gurit also carried out testing in their analytical laboratories on samples of the masts and test panels to verify laminate quality, cure cycles and laminate properties. The masts laminates consist of unidirectional and biaxial E glass reinforcements lam