Case Study

Leyton Green Towers

Leyton Green Towers

Pages 2 Pages

Background Axis has completed the external refurbishment of a residential tower block which included extensive repair work prior to fit out and decoration. The existing metal Crittall frames, from roof level to first floor, that enclosed the stairwell were cut out and removed with any asbestos being examined, treated and removed. Upon the removal of the windows the concrete was inspected and repaired accordingly to ensure structural integr

Join for free to read