Case Study
Level Measurement with Data Transmission & GPRS
74 Measurement Campaigns Channel Networks Wastewater Treatment Plant Flowing Water Industry Water Supply Water Supply Groundwater Reference Application Level Measurement with Data Transmission via GPRS Solution Planning / Conception Definition of Task + + Measuring tube with 150 mm diameter No power supply available on site + + + + + Groundwater level measurement at multiple level measurement spots Data logger installed in measuring tube Stabl