Lempster Wind Farm East Lempster, NH
Lempster Wind Farm East Lempster, NH Owner Lempster Wind, LLC Project Type Sitework for a Wind Farm Sargent Corporation’s Role Sitework contractor Start/Finish December 2007—September 2008 Turbines 12 Description/Significance This project included construction of 5 1/2 miles of access roadway and 12 turbine pads. Steep terrain at eleva- tions over 2,000 feet and access to the job site were the most difficult h