Case Study
Leicester Septicity Sampling Project
The Rothley Valley Trunk Sewer project was a 6-month study of the sewer systems in West Leicester. The study consisted of a variety of investigation techniques, with the key factor to the study being a 5-week water sampling project between September and October 2011. Historically the Rothley Valley Sewer has had long term septicity issues associated with Hydrogen Sulphide, resulting in sewer collapse and on-going extensive use of chemical d