Case Study

Lee Lake Water District EQ Basin – Containment System

Lee Lake Water District EQ Basin – Containment System

Lee Lake Water District EQ Basin – Containment System LOCATION: Corona, California, USA DATE OF INSTALLATION: 2013 SCOPE OF WORK: Design-Build of Enviro Liner® 6060HD Geomembrane Base Liner and Floating Cover Containment System CUSTOMER: Lee Lake Water District Challenge The Lee Lake Water District was required by the California Regional Water Quality Control Board (CRWQCB) to tender the design and construction of a containment structure fully equipped with a geomembrane base-liner (to protect the groundwater) and a oating cover. The oating cover was required to control odor, eliminate evaporation and protect the E.Q. Basin from water fowl, animals and vector control. In an eort to manage high growth in Riverside County, the district needed to add capacity to store and treat wastewate

Join for free to read