Case Study

Leading UK Dairy Processing Plant

Leading UK Dairy Processing Plant

Case Study Leading UK dairy processing plantTypical storage before System8® Storage after System8® Storage after System8® Potential risks • High risk of contamination of food by mis-application • Product recall from mineral oil contamination • Non-compliance in audit situations • Inadequate system of control and dispensing The solution Introduction of System8® A free System8® eight week trial was concluded very successfully on site, with interactive product and application training provided to a number of the engineers and further lubrication and reliability training provided too. The problem Existing Lubricant Storage Situation The existing lubricant inventory included approximately. 47 lubricants from 17 manufacturers. 21 of these lubricants are not NSF H1 registered – required t

Join for free to read