Case Study

Larport Energy Storage Project

Larport Energy Storage Project

Pages 1 Pages

Email: info@athena-pts.com The Larport Energy Storage site based in Herefordshire is a 20MW Battery Storage site providing energy direct to the grid. LARPORT ENERGY STORAGE PROJECT SOLUTION IMPLEMENTED Athena PTS Work Scope: Athena PTS were responsible for the Design, Installation and Commissioning of the Contestable and Private 66kV Grid Connection Works and Earthing Design and Installation for the entire site. This enabled the connection of the Battery Storage Scheme to the grid. Using our own skilled and experienced personnel along with selected contract partners, the project was delivered in line with the clients requirements. Equipment: Athena PTS procured and installed the following: WPD 66kV AIS Compound Private 66/33kV AIS Compound 66kV GE Dead T ank Circui