Case Study
Lark Energy
Customer: Lark Energy DNO: Scottish and Southern Energy Location: Chalgrove, Oxfordshire, UK SSE Substation The standard HV solar connection included supply and installation of a WPD RMU unit. However GEW2 scope was extended to cover G59 and WPD substations plinths. The cable route was installed to SSE OHL connection via three core aluminum cable. GEW2 assisted customer with a number of additional site