Case Study

Large Supply AHU

Large Supply AHU

Pages 1 Pages

CASE STUDY LARGE SUPPLY AHU ISSUE A large food preparation site were extending their factory, and looking for cooled air, filtered to HEPA standard to supply a high-care area. SOLUTION We installed a large 40,000m 3 /hr AHU with 3 stage filtration and glycol cooling coil and recirculation from the factory to provide energy savings. Unit 18, Burnt Mill Industrial Estate, Elizabeth Way, Harlow, Essex, CM20 2HS Telephone: 01279 457590 | Fa

Join for free to read