Case Study
Large Data Centre Move
case study Large Data Centre Move project details size: 626 servers and 28 racks sector: technology relocation duration: one day the challenge: - 626 servers and 28 racks to be moved in one phase, including all equipment. - Downtime had to be kept to a minimum as council applications run 24/7. the bene?ts: - All servers and equipment was moved in a single day, keeping downtime to an absolute minimum. - 12 engineers at each site provided