Case Study

Large Copper Mining Operation In Northern Chile

Large Copper Mining Operation In Northern Chile

Pages 1 Pages

Moly-Cop NG Trial SAG milling line operation • The Trial The site has a single SAG milling line. The Reference Period (Pre-Purge) was undertaken between November 2013 and May 11, 2014. The Evaluation Period (Post-Purge) was defined between July 15, 2014 and November, 15 2014. During the latter period, the Moly-Cop NG product was charged to the mill. • The Results The Moly-Cop NG product observed an estimated reduction in ball consumption of

Join for free to read