What We Do | ECM | Process & Industrial | Success Stories |Large Chemical Production Plant Day & Zimmermann Scope of Services With critical schedule constraints to convert their coal-fired industrial boilers to meet EPA guidelines, our client selected Day & Zimmermann as its contractor – continuing a 30-year relationship at their North American sites. D&Z leveraged its extensive capabilities and experience in utility boiler projects to provide engineering, procurement, and construction for the conversion of two existing 220,000lbs/hr at 900 psi superheated coal-fired industrial boilers to operate on natural gas No.2 fuel oil. The project included extensive demolition and removal of existing equipment, as well as the shutdown of an operating boiler. New air quality control equipment inclu