Case Study
Large Air Volumes & Extreme Reliability are Keys to Success
The Challenge A major UK energy provider had taken over an old wind turbine manufacturing facility and were updating the site with a new paint and preparation building. The challenge was to provide large volumes of compressed air to a blasting operation. This alone consumed around 1,200cfm at 6bar of instantaneous demand, with further demand for the zinc coating and final painting. The building was constructed as a production l