Case Study

Langford Lakes

Langford Lakes

the River Restoration Centre Case Study Series This site was last visited by RRC staff on 27th September 2002 Tel/fax: 01234 752979 Email: rrc@therrc.co.uk http://www.therrc.co.uk Sediment trapping and some bank protection using brush- wood stakes Sediment trapping using live willows pushed into the bank Sediment trapping using live faggots and pegs An upstream pointing v weir made from logs obtained locally with large cobbles placed upstream Langford Lakes Technique: improvement of in-stream habitat through a variety of methods Project location: Steeple Langford River: Wylye County: Wiltshire Project start date: Autumn 2002 Project end date: Autumn 2002 Length: Approx 1km

Join for free to read