Case Study
LA County
On January 15, 2006, a power failure at a pump station in Manhattan Beach resulted in massive flooding. Although a sophisticated SCADA system was in place to monitor and manage the wastewater collection system, an extraordinary and simultaneous combination of equipment and communication failures resulted in the largest wastewater spill to hit the county in a decade. This evoked disappointment from residents and environmentalists alike, an