Case Study

Koror-Babeldaob Bridge, Collapse Investigation

Koror-Babeldaob Bridge, Collapse Investigation

Pages 1 Pages

PROJECT PROFILE WJE www.wje.com Koror-Babeldaob Bridge Collapse Investigation | Koror, Palau CLIENT Republic of Palau BACKGROUND The Koror-Babeldaob Bridge is a prestressed concrete box-girder bridge built in 1977. The 790-foot main-span was a record span length for segmental concrete box- girder construction at the time it was

Join for free to read