WA TER TREA TMENT THE MODULAR EXPERTS Project Title: Kinlochewe WTW (TTU) Client: Scottish Water Solutions 2 Limited for Scottish Water Project Value: £2.0M Design Start: 15th August 2011 Manufacture Start: 3rd October 2011 Delivery to Site: 3rd September 2012 Works Address: Kinlochewe to Torridon Road, Kinlochewe IV22 2PE www.ross-eng.com CASE STUDY KINLOCHEWE TTUCase Study / Kinlochewe TTU This Works involved the design, construction, installation and commissioning of a new 150m3/d Nanofiltration (NF) Modular and Transportable Treatment Unit (TTU) membrane plant to replace the existing system on site. Through the Scottish Water Solutions 2, Ross-shire Engineering (RSE) was engaged to design, manufacture and install a 150m3/d NF Transportable Treatment Unit (TTU) membrane p