Case Study
Kingsgate House, London: Preloading Steelwork
Swantest have been working alongside Careys at Kingsgate House in London during the excavation of a large basement area which is 19m deep in some sections. During these excavation works large kingposts have been pile driven around the perimeter wall to act as support. On one side of the excavation is Victoria Street and on the on the opposite side there are LUL tunnels. Ensuring that there is minimum movement in these walls during excava