Case Study

Kinder Morgan Methanex Terminal

Kinder Morgan Methanex Terminal

Pages 1 Pages

FOR MORE INFORMATION: matrixpdm.com | 866 367 6879 KINDER MORGAN METHANEX TERMINAL DESCRIPTION Matrix PDM Engineering provided engineering, design and equipment supply services for three new carbon steel tanks to store and handle methanol at Kinder Morgan’s Methanex terminal. CLIENT - Kinder Morgan LOCATION - Geismar, LA COMPLETED - 2015 PRINCIPAL FEATURES • Design of three 220,000 barrel carbon steel tanks • Design for the addition of an eight-spot rail loading/ offloading and staging area and a two-bay truck loading/offloading rack • Piping distribution, including specifications, calculations, and drawings • Field investigations and determined locations of equipment, distances and routings for conduit and tray, existing PLC system and interface points to the control net

Join for free to read