Case Study

Kilkenny Drive

Kilkenny Drive

Pages 3 Pages

Project Summary Kilkenny Drive In 1997, the Red River "Flood of the Century" impacted the City of Winnipeg's residential areas along the riverbank. Protected by temporary sand bags. Following the flood, the Kilkenny Drive North Community qualified for funding to implement permanent flood proofing measures. With residents experiencing flooding up to 6 ft (1.8 m), Winnipeg was faced with finding a solution to provide permanent flood proofing. A community ring dike that retained water and was structurally sound and aesthetically pleasing was the solution. The design goal also included a desire to avoid future risk, stress and disruption to residents as well as minimize environmental impacts to preserve existing trees and vegetation in the riverbank setting. PROJECT NAME & LOCAT