Case Study
Kidbrooke Ph3
www.coinford.co.uk GROUNDWORK AND CONCRETE FRAME SPECIALISTS Kidbrooke Ph3 CLIENT: Berkeley Homes Urban Renaissance CONTRACT VALUE: £18.5 Million The construction of the basement and podiums to Blocks A & B, including energy centre below block A. Superstructure to block A apartments comprising of 4 no. Blocks ranging from 11 to 16 floors. Construction of 3 storey in situ concrete substation Block D. SCOPE OF WORKS Existing site preparation. Construction of access road, foul and surface water drainage Road construction for Cambert Way into podium and basement and T udway Road to basement to highway specification Sheet piling attendance Concrete foundation piling attendance to Plot B T emporary propping Retaining wall construction Excavation of pile mat to Plots A, B & D