Case Study

KENTOR MINERAL S – JERVOIS PROJECT

KENTOR MINERAL S – JERVOIS PROJECT

For further information email info@mitchellservices.com.au or call +61 (0) 7 3722 7222 www.mitchellservices.com.au Client: Kentor Minerals Service: Infill resource definition, ~12,000m RC Location: Jervois, Northern Territory, Australia Project Challenges: • Managing hole deviation issues • Angled drilling in areas • Terrain for drill pads • Adverse temperature conditions given Northern Territory location • Set up for RC double-shift drilling Approach and Equipment Used: • Two specialist RC rigs (Schramm T685 track and truck mounted rigs) with onboard air and rod handlers • Two 8x8 support trucks • Two Mine Specified Toyota Landcruiser LV’s • Fuel and water pods • One container with critical spares • Survey equipment Client Outcomes: • Zero Lost Time Injuries (LTI’s) • RC holes achi

Join for free to read