Case Study
Kentec protects State-of-the-Art Semi-Submersible
The re tting of The MV Red Osprey followed that of MV Red Falcon back in 2015, leaving just the MV Red Eagle to go as part of Red Funnel Group’s multi-million pound refurbishment of its three vehicle ferries, which has seen the interior design and facilities of each ship replaced with a bright, modern and stylish new look which has set a high level of passenger facilities and comfort on board this popular Isle of Wight ferry route for both pleasure and business commuters. Refurbishment of the three vehicle ferries’ re systems too has been an important part of this project, to ensure the safety of passengers and crew. The re safety system, designed by leading marine re suppression and protection experts Fireboy-Xintex UK Operations Ltd., has been engineered using Kentec Syncro ASM 2 Loop