Case Study

KEE design and manufacture extended NuDisc® 2000 RBC Installation for Spanish Village

KEE design and manufacture extended NuDisc® 2000 RBC Installation for Spanish Village

Pages 2 Pages

CASE STUDY “Fullgas are delighted that the installation of KEE’s NuDisc ® RBC was completed on Monday without a single glitch. All the components fitted into place perfectly and we thank KEE for their expertise, attention to detail and commitment to the successful completion of this project.” Pablo Cepeda, Fullgas. KEE design and manufacture extended NuDisc ® 2000 RBC Installation for Spanish Village. Background Fullgas offer environmental

Join for free to read