Case Study
K19 Rieden Slope stabilization
K19 Rieden Slope stabilization In conjunction with construction works carried out earlier at the road K19 between Rieden and the Rieden mills in the area of the Vulcan-Eifel in Germany, the slope basis of a dam had been ablated and a 30 to 40 m high slope with a 33 degree down-grade has been built. In the course of time this activity and the related material withdrawal deranged the natural balance of both stability and structural safety of