Case Study
Junction 12, M1, Bedforshire, UK
® © Concrete Canvas Ltd. 2018 The information contained herein is offered free of charge and is, to the best of our knowledge, accurate. However, since the circumstances and conditions in which such information and the products discussed therein can be used may vary and are beyond our control, we make no warranty, express www.concretecanvas.com info@concretecanvas.com +44 (0) 345 680 1908 www ® *Geosynthetic Cementitious Composite Mat i # Project Info AUG 8 08 / 08 / 12 CC8 TM Bulk Rolls 1125m 2 Longitudinal layers Junction 12, M1, Bedforshire, UK Costain and Carillion JV CC8 TM was used to line a channel to prevent seepage and control water runoff Completed installation In August 2012, Concrete Canvas ® GCCM* (CC) was used to line a 320 linear metre drainage channel located at the