Case Study
Joined up approach between Polygon, insurers and loss adjusters minimises claim costs and business interruption
Joined up approach between Polygon, insurers and loss adjusters minimises claim costs and business interruption
Case Study: Joined up approach between Polygon, insurers and loss adjusters minimises claim costs and business interruption Display cabinets and fixtures were stripped out of Fagans. A typical reading of 100% WME found before commencement of drying. Water Damage restoration Property Damage restoration Property Performance Services Temporary Humidity Control In November 2009 flooding ravaged parts of the UK, most notably in Cumbria and t