Case Study
John F. Seiberling Federal Building & U.S. Courthouse
7819 Broadview r oad • Cleveland, o H 44131 • 1.800.522.4522 • Tel 216.642.1200 • Fax 216.642.1166 • www. s Tay Flex. Com PREFERRED SOLUTIONS, INC. PROJECT PROFILE The R-19.5 Staycell ® HYBRID System application consisted of 2.5” Staycell ® 265 covered with 1/2” Staycell ONE STEP ® 255. The HYBRID System was chosen because it was more cost-effective than a standard foam and intumescent coating system. KEY BENEFITS: • Provides superior