Case Study

Jewish Academy

Jewish Academy

Pages 4 Pages

Project Summary Jewish Academy Allan Block retaining walls have been used in more settings than anyone dreamed possible. Applications continue to come along adding to the system’s list of successes, each one bigger and better than the last. The San Diego Jewish Academy’s Carmel Valley Campus utilized a hillside that could have easily been overlooked, but Allan Block retaining walls with heights reaching 50 ft (15.2 m) enabled a beautiful, functional, and fast paced project to be completed. PROJECT NAME & LOCATION Jewish Academy, San Diego, CA PRODUCT AB Rocks PROJECT SIZE 70,000 ft2 50 ft (15.2 m) maximum height GENERAL CONTRACTOR DPR Construction WALL BUILDER West Coast General ALLAN BLOCK MANUFACTURER Orco Block, Riverside, CA The Academy was in need o

Join for free to read