Case Study
Jacobs Biscuit Factory
Jacobs Biscuit Factory Above food preparation areas, the existing rooflights needed replacing, but it was vital no broken glass could ever enter the production chain for obvious reasons. Our PlasGard patent glazing system combined with ‘unbreakable’ multi-wall polycarbonate was the obvious solution. Ventilators were fitted with fly-screens to prevent insects entering the building as again everything had to be done to prevent contamination of the food-stuffs being produced below. PROJECT SUMMARYBrief: Existing Northlights were in need of refurbishment Budget: £70k Testimonial: “Thank you for a job well done” Mike Wetherby, Jacob’s Bakery Ltd