Case Study

Isola Platon Membrans Specified for New Basement

Isola Platon Membrans Specified for New Basement

Pages 2 Pages

Case Study March 2008 Isola Platon membranes s Pec If Ied for new basement a new basement dug beneath the entire footprint of an Edwardian terraced home was built by Triton approved contractors, the London cellar conversion company, and waterproofed with Isola Platon cavity drain membranes. Excavation works started at the front of the house with the team tunnelling under the building by hand, installing supports as they worked, until th

Join for free to read