Island DER Integration

The Shetland power grid operates as an electrical island, with no interconnection to the main UK grid. Stability constraints, caused by an imbalance between generation and demand, have severely limited the amount of renewable generation that can connect to the grid despite the vast renewable resources available. Scottish and Southern Electricity Power Distribution (SSEPD) has deployed an Active Network Management system to coordinate a ran