Case Study

IPM Reduces Polymer Consumption by 25%

IPM Reduces Polymer Consumption by 25%

Pages 2 Pages

4225 NE Port Drive Lee’s Summit, MO 64064 Toll Free: 855.328.9200 Office: 816.795.6333 Fax: 816.795.6030 sales@ipm-sys.com CASE STUDY: IPM Reduces Polymer Consumption by 25% ParaDyne™ Polymer Activation System – June 2012 Woodstock, IL Treatment Facility The City of Woodstock, IL Wastewater Treatment Plant, located approximately 50 miles Northwest of Chicago, serves a population of 24,000 people in McHenry County Illinois.

Join for free to read