Case Study

IPEX Guards 137 Million Gallons a Day at the Lakeview Wastewater Treatment Plant

IPEX Guards 137 Million Gallons a Day at the Lakeview Wastewater Treatment Plant

Pages 2 Pages

IPEX Industrial Case Study Water & Wastewater Treatment Applications See Next Page IPEX Guards 137 Million Gallons a Day at the Lakeview Wastewater Treatment Plant O riginally built in the late 1950s to handle an average flow of 2 million gallons per day (mgd), the G.E. Booth (Lakeview) Wastewater Treatment Plant (WWTP) is a key facility for the Region of Peel. In 2009, the facility underwent a $260 million expansion to treat 137 mgd from

Join for free to read