Case Study
Internal Corrosion
An overview of 6” flow line. B-Scan prove up at the severe defect location which confirms the internal corrosion. • 6” crude oil line • Non-painted surface • Dessert terrain with no pipe supports • Partially buried in sand Job Details • Over 20m of pipe was inspected from a single location • Several locations of internal corrosion were positively identified. • B-Scan prove up confirms the defect severity Main Findings Equip