Case Study

Intermountain Medical Center

Intermountain Medical Center

Intermountain Medical Center • Murray, UT • Summer 2006 • Geofoam Foundation Stabilization • 138,000 Cubic Feet Architect Ben Nelson Anshen & Allen Architecture Contractor Mike Jones Oakland Construction Intermountain Medical Center Geofoam In • • • • A B A C M O Application 138,000 cubic feet of EPS 15, 19, 22 and 29 Geofoam was installed around the foundation of the Intermountain Medical Center in Murray, Utah. Project Details Summer

Join for free to read