Case Study
Intermountain Medical Center
Intermountain Medical Center • Murray, UT • Summer 2006 • Geofoam Foundation Stabilization • 138,000 Cubic Feet Architect Ben Nelson Anshen & Allen Architecture Contractor Mike Jones Oakland Construction Intermountain Medical Center Geofoam In • • • • A B A C M O Application 138,000 cubic feet of EPS 15, 19, 22 and 29 Geofoam was installed around the foundation of the Intermountain Medical Center in Murray, Utah. Project Details Summer