Case Study
Interloop reduces Work In Progress (WIP) and lead time by using Fast React’s Align
Case Study Ref: Fast React_Align_Case Study_Interloop Interloop reduces Work In Progress (WIP) and lead time by using Fast React’s Align The Customer Interloop currently operates 4 factories based in Faisalabad, Lahore and Bangladesh. With over 3000 sock knitting machines, they produce an estimated 360 million pairs annually. With a determined and professional business approach and a 20 year history as an exporter, Interloop is highly regard