Case Study
Integrator Relies On Anixter’s Technical And Supply Chain Expertise To Build Two Data Centers For A European Bank
Integrator Relies On Anixter’s Technical And Supply Chain Expertise To Build Two Data Centers For A European Bank
CASE STUDY INTEGRATOR RELIES ON ANIXTER’S TECHNICAL AND SUPPLY CHAIN EXPERTISE TO BUILD TWO DATA CENTERS FOR A EUROPEAN BANK Customer Challenge The local team of a global integrator was helping to design two 200-square-meter Tier 3 data centers for a leading European bank. A major concern for the end-user was the limited amount of space. Because of this, the end-user required high-density cabling due to rack space limitations. Along with the