Case Study
Integrated system provides temporary bypass at Colorado treatment plant
Case study Integrated system provides temporary bypass at Colorado treatment plant Project In Colorado, the project team for an expansion and renovation of a wastewater treatment plant was in need of a bypass system to move a peak ? ow of 128 million gallons per day. Wagner Rents, the rental arm of Wagner Equipment and Xylem’s Godwin and Flygt distributor in Colorado was named the bypass contractor for this portion of the job. Wagner Rents