Case Study
Integrated Pipeline Project
13 12 FNI completed a program-wide route study and provided program-wide environmental services and permitting for the proposed 149-mile Integrated Pipeline (IPL) from Lake Palestine in East Texas to Lake Benbrook in Fort Worth for TRWD and Dallas Water Utilities (DWU). The route study identified the initial route for the pipeline and locations for pump stations and reservoirs. In addition, FNI provided a program-wide hydraulic analysis for