Case Study
Intake And Pump Station Construction
INFO@LAYNE.COM | For more information, or to speak with an expert please visit us at WWW.LAYNE.COM © 2013 Layne. All rights reserved. 10.042.08012013 INTAKE AND PUMP STATION CONSTRUCTION Owenton, KY SITUATION: This intake and pump station was designed to supply raw water from the Kentucky River Pool 3; the pump station site was 200 feet lower than the plant site on the river bank plateau and the intake level from the river