Installing subsea cables at Horns Rev, Europe’s 1st commercial wind farm situated in the North Sea

Installing subsea cables at Horns Rev, Europe’s 1st commercial wind farm situated in the North Sea

www.globalmarinesystems.com Installing subsea cables at Horns Rev, Europe’s 1st commercial wind farm situated in the North Sea Offshore Renewables CASE STUDY Project: Horns Rev 1 (2002) Connections: 160-80 wind turbines Distance between turbines: 560m Burial Depth: 2m Water Depth: 6.5 - 13.5m Project: Horns Rev 1 (2009) Vessel: C.S. Sovereign Mattresss Installation: 175 Length cable installed: 64 km Number of inter arrays: 91 Vessel: C.S. Sovere