Installing submarine power grid for offshore wind farms for the first time in the US

Installing submarine power grid for offshore wind farms for the first time in the US

Submarine cables · Installing submarine power grid for offshore wind farms for the first time in the US · Providing a turnkey solution for replacing old cables in advanced countries Installing submarine power grid for offshore wind farms for the first time in the US Best Practices Project Block Island Transmission System(BITS) & Wind Farm(BIWF) Customer · BITS: National Grid (New England Power Authority) · BIWF: Deepwater Wind Objective · BITS: To connect the power grids of Rhode Island Mainland and Block Island in the northeaster part of the US · BIWF: To connect Block Island and the 5 offshore wind turbines in the wind farm Products delivered AC 34.5kV submarine optical cables (Export / Array Cables), junction boxes Total length 45km (maximum depth 40m) Schedule 2015.4~2017.1 Implication