Case Study

Installation Of Cantilever Racking Systems, Reconfigured Pallet Racking And Mezzanine Floor For Thermoseal Group

Installation Of Cantilever Racking Systems, Reconfigured Pallet Racking And Mezzanine Floor For Thermoseal Group

Pages 2 Pages

Key Features: ¦ 13,700 sq/ft approx. work area including installation of cantilever racking storage system ¦ Reconfiguration of back wall pallet racking ¦ Installation of mezzanine floor with lighting, pallet gate, longspan shelving feature and general storage for production areas Installation of cantilever racking systems, reconfigured pallet racking and mezzanine floor for Thermoseal GroupThe project required not only the planning

Join for free to read