Case Study
Installation A New 110 Tons Tilepress
INST ALLA TION A NEW 110 TONS TILEPRESS Every project brings its own surprises. The plans are drawn up, CAD drawings prepared, people and equipment are allocated, arrangements are made and deadlines are set. And it wasn’t any di?erent when the time came to install the tile press at Royal Dutch Mosa in Maastricht. So, at the prearranged time, the assigned Convoi sta? headed for Maastricht, lift system and equipment in tow. But the tile press was nowhere to be seen. In the end, the lift system spent 3 weeks standing around for the tile press which was due to arrive from Milan in Italy. The whereabouts of the tile press were a complete mystery. Now, how a 110-ton piece of equipment can vanish into thin air is really anyone’s guess! In the end, it turned out that the permit systems in France a