Case Study

Inspection Of A Coal-Fired Boiler Superheater

Inspection Of A Coal-Fired Boiler Superheater

Pages 3 Pages

1 www.flyability.com | info@ronik.nl OCTOBER 2016 CUSTOMER NEED During an annual plant shutdown, metal rings and connectors were found on the floor of a boiler. These elements are used to hold in place the horizontal piping located in the superheaters at the uppermost part of the boiler. The purpose of the mission was to determine the root cause of failure which made these elements fall on the boiler’s floor. For similar inspections involvin

Join for free to read