Case Study
In?ow Oil and Water Production Pro?ling Using Chemical Tracer Technology
In? ow oil and water production pro? ling using chemical tracer technology RESERVOIR CHARACTERISATION The Project An operator drilled and completed a single well bore consisting of an 8 1 /2" open hole with 6 5 /8" completion screens. At ? rst oil and extending into long term production they wanted to: • Monitor oil production contribution along the well bore. • Con? rm time and location of water breakthrough. • Assess production pro