Case Study

In?ow Oil and Water Production Pro?ling Using Chemical Tracer Technology

In?ow Oil and Water Production Pro?ling Using Chemical Tracer Technology

Pages 2 Pages

In? ow oil and water production pro? ling using chemical tracer technology RESERVOIR CHARACTERISATION The Project An operator drilled and completed a single well bore consisting of an 8 1 /2" open hole with 6 5 /8" completion screens. At ? rst oil and extending into long term production they wanted to: • Monitor oil production contribution along the well bore. • Con? rm time and location of water breakthrough. • Assess production pro

Join for free to read