Case Study

Innsbrucker Kommunale, Innsbruck, Austria

Innsbrucker Kommunale, Innsbruck, Austria

Pages 1 Pages

Innsbrucker Kommunale, Innsbruck, Austria Lightweight Fibrelite Covers Solve Manual Handling Issues For Waste Water Access Point Project Overview Problem Solution Results Fibrelite manufactured custom lightweight covers to fit directly into the existing frame Custom Fibrelite covers retrofit into existing frames, including an inspection port exactly over the slider Previously installed heavy (15cm thick) concrete/steel infill covers Fibrelite provided a lightweight replacement for previously installed heavy (15cm thick) concrete/steel infill covers at an intersection in the center of Innsbruck, Austria. Removing the previously installed covers was time consuming due to the covers’ weight (approximately 100kg). A specialised tripod was needed to lift the covers, which was both cos

Join for free to read