Case Study
Infrared helps blind manufacturer speed up production
Data sheet – July 2007 – Any changes reserved Infrared helps blind manufacturer speed up production Infrared pre-heating increases running-speed An infrared pre-heating system has solved a production bottleneck problem, by allowing production line speeds to be significantly increased at the Chesham plant of Living Connections, one of the leading manufacturers of window blinds in the UK. The blinds of Living Connections are suppl